SectorsSteelSALCOS stage one

SALCOS stage one

Salzgitter AG · Salzgitter · DE · Steel · decarbonisation

In construction1.9 Mt crude steel per year

SALCOS stage one is Salzgitter AG's steel project at Salzgitter, Germany.

Why it matters

It is being built.

Where SALCOS stage one is

SALCOS stage one is at Salzgitter steelworks. Also in frame: 5 sites using the same technology.

BelgiumBelgiumCzechiaCzechiaGermanyGermanyNetherlandsNetherlandsPolandPolandSALCOS stage one — Salzgitter AG. Salzgitter steelworks, 52.1631° N 10.4107° E.SALCOS stage oneSalzgitter AGSALCOS stage oneSalzgitter AGLingen Green Hydrogen (LGH2) — BP Europa SE. bp Raffinerie Lingen, 52.5605° N 7.3073° E.Lingen Green Hydrogen (LGH2)BP Europa SELingen GreenHydrogen (LGH2)BP Europa SEHamburg Green Hydrogen Hub, Moorburg — Hamburg Green Hydrogen Hub GmbH & Co. KG. Kraftwerksgelände Moorburg, Hamburg, 53.4885° N 9.9500° E.Hamburg Green Hydrogen Hub, MoorburgHamburg Green Hydrogen Hub GmbH & Co. KGHamburg GreenHydrogen Hub,MoorburgGET H2 Nukleus — Lingen — RWE Generation SE. GET H₂ Nukleus, Lingen (Ems), 52.4852° N 7.3030° E.GET H2 Nukleus — LingenRWE Generation SEGET H2 Nukleus —LingenRWE Generation SEREFHYNE 2 — Shell Energy and Chemicals Park Rheinland — Shell Deutschland GmbH. Shell Energy & Chemicals Park Rheinland, Werk Wesseling, 50.8171° N 7.0069° E.REFHYNE 2 — Shell Energy and ChemicalsPark RheinlandShell Deutschland GmbHREFHYNE 2 — ShellEnergy and ChemicalsPark RheinlandShell Deutschland GmbHtkH2Steel — thyssenkrupp Steel. Duisburg steelworks, 51.4907° N 6.7272° E.tkH2Steelthyssenkrupp SteeltkH2Steelthyssenkrupp Steel
filled: operating, commissioning or under constructionhollow: announced, funded, or pausedringed: this project

52.1631° N 10.4107° ESalzgitter steelworks

as of 2026-09-09

Status

  1. Announced
  2. Funded2023-04-18
  3. FID taken
  4. In construction2024-03-07
  5. Operating
  • 2023-04-18FundedOfficial notice of €700 million federal and €300 million Lower Saxony funding for stage one.source
  • 2024-03-07In constructionContract awarded for the direct reduction unit, the largest sub-unit of stage one.source

Technology and measures

  • Direct reduction with an electric furnacedemonstrationIron ore is reduced in the solid state with gas rather than smelted with coke in a blast furnace, and the resulting iron is melted in an electric furnace. It is the route Europe's integrated sites are converting to, and it is being built to run on natural gas first and hydrogen later, which is why the conversion and the fuel are two different questions with two different timetables.
  • Hydrogen direct reductionpilotThe reducing gas is hydrogen rather than natural gas, so what leaves the furnace is water rather than CO2. It is the only route that takes the chemistry of ironmaking to near zero, and it is separated from the conversion itself because every European unit under construction is being commissioned on natural gas and switched later.
  • Renewable hydrogen supplydemonstrationThe electrolysers, power contracts and pipelines that have to deliver hydrogen at industrial volume and at a price the iron pays for, and which no single steel site can build for itself. It stands beside CO2 transport and storage as the other thing that sector is waiting for rather than doing. IT IS NOW SHARED. Steel reached it as a dependency; the hydrogen dataset reaches it as the thing being built, so the technology carries both sectors rather than being duplicated under a second name.

Funding

  • €700 mGerman federal funding for industrial decarbonisationapprovedA national decision. The register has read no act that carries the German scheme, so the funding names its programme and points at no measure. See issue #39.“€ 700 million in federal funding and € 300 million from the state government”source
  • €300 mState of Lower Saxony fundingapprovedA regional decision alongside the federal one. Recorded as its own allocation because two governments took two decisions, and a single row would state one funder where there are two. See issue #39.“€ 700 million in federal funding and € 300 million from the state government”source

Sources