SectorsWind, heat pumps, hydrogenHamburg Green Hydrogen Hub, Moorburg

Hamburg Green Hydrogen Hub, Moorburg

Hamburg Green Hydrogen Hub GmbH & Co. KG · Hamburg-Moorburg · DE · Wind, heat pumps, hydrogen · decarbonisation

In construction

Where Hamburg Green Hydrogen Hub, Moorburg is

Hamburg Green Hydrogen Hub, Moorburg is at Kraftwerksgelände Moorburg, Hamburg. Its position is Kohlekraftwerk Moorburg (stillgelegt), the works it stands on, rather than the installation itself. Also in frame: 3 sites using the same technology.

GermanyGermanyDenmarkDenmarkNetherlandsNetherlandsPolandPolandHamburg Green Hydrogen Hub, Moorburg — Hamburg Green Hydrogen Hub GmbH & Co. KG. Kraftwerksgelände Moorburg, Hamburg, 53.4885° N 9.9500° E.Hamburg Green Hydrogen Hub, MoorburgHamburg Green Hydrogen Hub GmbH & Co. KGHamburg GreenHydrogen Hub,MoorburgHamburg Green HydrogenHub GmbH & Co. KGLingen Green Hydrogen (LGH2) — BP Europa SE. bp Raffinerie Lingen, 52.5605° N 7.3073° E.Lingen Green Hydrogen (LGH2)BP Europa SELingen GreenHydrogen (LGH2)BP Europa SEGET H2 Nukleus — Lingen — RWE Generation SE. GET H₂ Nukleus, Lingen (Ems), 52.4852° N 7.3030° E.GET H2 Nukleus — LingenRWE Generation SEGET H2 Nukleus —LingenRWE Generation SESALCOS stage one — Salzgitter AG. Salzgitter steelworks, 52.1631° N 10.4107° E.SALCOS stage oneSalzgitter AGSALCOS stage oneSalzgitter AG
filled: operating, commissioning or under constructionhollow: announced, funded, or pausedringed: this project

53.4885° N 9.9500° EKraftwerksgelände Moorburg, Hamburg

as of 2026-09-09

Status

  1. Announcedby 2023-09-23
  2. Funded
  3. FID taken
  4. In construction2025-12-01
  5. Operating
  • by 2023-09-23Announced'Wenn alle Genehmigungen und Freigaben rechtzeitig erteilt werden, kann die Wasserstoffproduktion 2026 starten' — announced, at Moorburg, two years before the construction event this row begins with. Found by the 2023-population test; the row had no event before December 2025.source
  • 2025-12-01In constructionHamburg's First Mayor 'legte heute den offiziellen Grundstein für den Bau des 100-MW-Elektrolyseurs am Standort des ehemaligen Kraftwerks Moorburg'. THE HISTORY STARTS AT THE FOUNDATION STONE AND NOT EARLIER, and the release itself names two earlier events this register does not hold a dated source for: the electrolyser was ordered from Siemens Energy in September 2024 and the ground works started in October 2023. A short history is honest — what is missing is a source, not the events.source

Technology and measures

  • Renewable hydrogen supplydemonstrationThe electrolysers, power contracts and pipelines that have to deliver hydrogen at industrial volume and at a price the iron pays for, and which no single steel site can build for itself. It stands beside CO2 transport and storage as the other thing that sector is waiting for rather than doing. IT IS NOW SHARED. Steel reached it as a dependency; the hydrogen dataset reaches it as the thing being built, so the technology carries both sectors rather than being duplicated under a second name.

Funding

No public capital recorded for this project.