Direction
44 burden · 17 benefit
Status
61 mixed
Channel
53 direct · 0 reached · 8 no sector

The platform holds 61 measures for CBAM extension: 44 imposing a burden, 17 conferring a benefit. Of these, 61 from a file spanning both; 53 arrive directly, 0 through a channel, 8 apply by size or activity rather than by sector.

Reach

Names 6 sectors, reaches 8

CBAM extension names 6 sectors; 2 more are — automotive, waste and landfill — reached without being named, by another act and supply chain.

Automotive — reached by 7 measures, via another act and supply chain

Waste and landfill — reached by 2 measures, via supply chain

Connections

This file in the graph

Every line is an edge in the platform's knowledge graph — acts this file amends or its measures cite, and the sectors those measures apply to. Counts are computed at build time and checked against the graph.

CBAM RegulationCBAM Regulationsince 2025Union Customs CodeUnion Customs Code2 measures cite itUnion Customs Code Delegated RegulationUnion Customs Code Delega…1 measure cites itSteelSteelnamed by 41 measuresreached by 3 measuresAluminiumAluminiumnamed by 40 measuresreached by 3 measuresCementCementnamed by 29 measuresreached by 2 measuresChemicalsChemicalsnamed by 29 measuresreached by 2 measuresPowerPowernamed by 16 measuresConstructionConstructionnamed by 1 measurereached by 7 measuresAutomotiveAutomotivereached by 7 measuresWasteWastereached by 2 measuresCBAM extension61 measures
Amends (1)Cites (2)Sectors (8)

40 measures

Steel

SCP-01CBAM applies to processed products made from Annex I goods under inward processing where they are re-exported to Norway or Iceland, bringing those consignments into the CBAM regime.Importers and authorised CBAM declarants of processed products re-exported to Norway or Iceland · BusinessesArt. 1(1)(a), inserting Art. 2(2a) of Regulation (EU) 2023/956 · upon incorporation of the Regulation in the EEA AgreementRequirementSCP-02Comply with the CBAM regime for goods originating in third countries that were previously released for free circulation in the customs territory of an EFTA State that has incorporated the CBAM.Customs declarants importing goods previously released for free circulation in a CBAM-integrated EFTA State · BusinessesArt. 1(1)(b), adding a subparagraph to Art. 2(4) of Regulation (EU) 2023/956 · upon incorporation of the Regulation into the EEA AgreementSimplificationSCP-03Bear responsibility for having documentation proving prior release for free circulation in an EFTA State available at the moment the customs declaration is lodged.Customs declarants relying on the EFTA prior-free-circulation exemption · BusinessesArt. 1(1)(b), adding a subparagraph to Art. 2(4) of Regulation (EU) 2023/956 · upon incorporation of the Regulation into the EEA AgreementRequirementSCP-04A new 'Combined metal products' category enters CBAM scope, pulling downstream steel- and aluminium-containing manufactured goods into the embedded-emissions declaration and certificate-surrender regime for the first time.Importers and authorised CBAM declarants of downstream steel- and aluminium-containing goods · BusinessesArt. 1(21); Annex I, point (2) adding the 'Combined metal products' table to Annex I of Regulation (EU) 2023/956 · applies from 1 January 2028 per Art. 2RequirementSCP-06Comply with CBAM for a good whose inclusion in Annex I is causing severe harm to the Union internal market through serious and unforeseen price effects.Importers of goods withdrawn from Annex I under the safeguard · BusinessesArt. 1(17), inserting Art. 27a of Regulation (EU) 2023/956 · from entry into forceSimplificationDECL-01Include in the CBAM declaration evidence that the imported goods were actually produced at the declared installation and at the declared time of production.Authorised CBAM declarants for goods flagged for supply-chain traceability risk · BusinessesArt. 1(5)(a)(2), adding point (e) to Art. 6(2) of Regulation (EU) 2023/956 · from entry into forceRequirementDECL-02Where a goods/origin combination is designated high-risk for abusive practices and actual emissions are claimed, prove in the declaration that the abuse risk has not materialised.Authorised CBAM declarants claiming actual emissions for high-risk goods/origin combinations · BusinessesArt. 1(5)(a)(2), adding point (f) to Art. 6(2) of Regulation (EU) 2023/956 · from entry into forceRequirementDECL-03Report total embedded emissions per tonne of goods (or per MWh for electricity), and have them verified where actual emissions are supplied by the operator through the CBAM registry.Authorised CBAM declarants · BusinessesArt. 1(5)(a)(1), replacing point (b) of Art. 6(2) of Regulation (EU) 2023/956 · from entry into forceRequirementDECL-05Produce, on request during review of the CBAM declaration, evidence that the imported goods were produced at the installation named in the declaration.Authorised CBAM declarants determining embedded emissions on actual emissions · BusinessesArt. 1(11), inserting Art. 19(2a) of Regulation (EU) 2023/956 · from entry into forceRequirementDECL-06Keep the full underlying records required to calculate embedded emissions, rather than the information actually disclosed to the declarant under Art. 10(7).Authorised CBAM declarants · BusinessesArt. 1(6)(b), replacing Art. 7(5) of Regulation (EU) 2023/956 · from entry into forceSimplificationCALC-01Count the embedded emissions of Annex VIII input materials (precursors) when determining the embedded emissions of the goods.Operators and authorised CBAM declarants calculating embedded emissions · BusinessesArt. 1(6)(a), inserting Art. 7(2a) of Regulation (EU) 2023/956 · applies from 1 January 2028 per Art. 2RequirementCALC-02Apply the complex-goods calculation counting precursors from both Annex I and the new Annex VIII, excluding those from exempted third countries.Operators of installations producing complex CBAM goods · BusinessesArt. 1(22); Annex II, point (2) replacing point 3 of Annex IV of Regulation (EU) 2023/956 · applies from 1 January 2028 per Art. 2RequirementCALC-03For iron and steel, aluminium and combined metal goods, derive the precursor mass from the content of input goods in the finished product rather than from a directly measured mass.Operators of installations producing iron and steel, aluminium and combined metal goods · BusinessesArt. 1(22); Annex II, point (2) replacing point 3 of Annex IV of Regulation (EU) 2023/956 · applies from 1 January 2028 per Art. 2RequirementCALC-04Treat ferrous waste and scrap, other than post-consumer scrap, as a precursor whose embedded emissions count towards the goods.Operators and declarants using ferrous scrap as an input material · BusinessesArt. 1(24); Annex III adding Annex VIII to Regulation (EU) 2023/956 · applies from 1 January 2028 per Art. 2RequirementCALC-06Bear the mark-up added to default values when declaring downstream goods with complex supply chains.Importers and declarants of listed downstream goods using default values · BusinessesArt. 1(6)(c), adding a subparagraph to Art. 7(7) of Regulation (EU) 2023/956 · from entry into forceSimplificationANTI-01Refrain from practices whose purpose is to gain a benefit by unduly avoiding, wholly or partly, the CBAM financial liability.All actors in the CBAM supply chain · BusinessesArt. 1(3), adding point (35) to Art. 3 of Regulation (EU) 2023/956 · from entry into forceRequirementANTI-02Refrain from artificially adjusting supply chains so that goods qualify for lower default values; doing so is circumvention.Importers, declarants and operators in CBAM supply chains · BusinessesArt. 1(16), adding point (c) to Art. 27(2) of Regulation (EU) 2023/956 · from entry into forceRequirementANTI-03Monitor the CBAM's internal-market impact, warn importers, declarants, competent and customs authorities of high-risk goods/origin combinations, and legislate the conditions for using actual emissions for them.European Commission · GovernmentsArt. 1(5)(c), adding Art. 6(7) to Regulation (EU) 2023/956 · from entry into forceRequirementFIN-01Provide a bank guarantee payable at first demand, sized on the certificates that would have to be surrendered, where the competent authority finds financial capacity is not demonstrated.Applicants and authorised CBAM declarants failing to demonstrate financial capacity · BusinessesArt. 1(9)(a), inserting Art. 17(5a) of Regulation (EU) 2023/956 · from entry into forceRequirementFIN-03From 2028, satisfy the quarterly certificate-holding requirement using only certificates bought in the same year, so certificates carried over from earlier years no longer count.Authorised CBAM declarants · BusinessesArt. 1(13), adding a subparagraph to Art. 22(2) of Regulation (EU) 2023/956 · from 2028RequirementFIN-04Pay the CBAM certificate price as fixed by the fallback rules for weeks with no auction or a single auction.Authorised CBAM declarants purchasing CBAM certificates · BusinessesArt. 1(12)(a), replacing the second subparagraph of Art. 21(1) of Regulation (EU) 2023/956 · from entry into forceRequirementFIN-06Have the documentation evidencing a carbon price paid in a third country certified by a person independent from the authorised CBAM declarant AS WELL AS from that country's authorities.Authorised CBAM declarants claiming a carbon price paid in a third country · BusinessesArt. 1(7)(a)(1), replacing the third sentence of Art. 9(2) of Regulation (EU) 2023/956 · from entry into forceSimplificationFIN-08Apply the Commission's conversion rules when turning a carbon price paid abroad into a reduction in CBAM certificates, including the evidence of actual payment and any deduction of Paris Agreement Article 6 carbon credits.Authorised CBAM declarants claiming a carbon price paid in a third country · BusinessesArt. 1(7)(b)(1), replacing the first subparagraph of Art. 9(5) of Regulation (EU) 2023/956 · from entry into forceRequirementDATA-01An operator may pass verified emissions and carbon-price information not only to an authorised CBAM declarant but to another operator, so verified data can move along the supply chain.Operators of installations in third countries registered in the CBAM registry · BusinessesArt. 1(8)(c), replacing the first sentence of Art. 10(7) of Regulation (EU) 2023/956 · applies from 1 January 2028 per Art. 2EntitlementDATA-02An operator may limit what it hands the declarant to a summary of the registered information, and the declarant is entitled to rely on that summary to discharge its Article 8 verification obligation.Operators of third-country installations and the authorised CBAM declarants they supply · BusinessesArt. 1(8)(d), replacing the second sentence of Art. 10(7) of Regulation (EU) 2023/956 · from entry into forceEntitlementDATA-03Remain responsible for surrendering the correct number of CBAM certificates even where the declaration was built on information disclosed by the operator.Authorised CBAM declarants relying on operator-disclosed information · BusinessesArt. 1(8)(d), replacing the second sentence of Art. 10(7) of Regulation (EU) 2023/956 · from entry into forceRequirementDATA-04Ensure that the conditions laid down for using actual emissions are met for the relevant combinations of goods and origins.Operators of installations registered in the CBAM registry · BusinessesArt. 1(8)(b), adding point (e) to Art. 10(5) of Regulation (EU) 2023/956 · applies from 1 January 2028 per Art. 2RequirementDATA-05A third-country operator may have its installation registered in the CBAM registry not only to support actual-emissions verification but to establish the carbon price it has paid at home.Operators of installations located in third countries · BusinessesArt. 1(8)(a), replacing Art. 10(1) of Regulation (EU) 2023/956 · applies from 1 January 2028 per Art. 2EntitlementCUST-01Communicate import data to the Commission automatically, now including bills of discharge, re-export declarations and equivalent customs documentation, and the importer's identity where there is no EORI number.Customs authorities of the Member States · GovernmentsArt. 1(15)(a), replacing Art. 25(2) of Regulation (EU) 2023/956 · from entry into forceRequirementCUST-02Accept that the CBAM account number entered in the customs declaration fixes which authorised CBAM declarant assumes the obligations for that consignment.Authorised CBAM declarants and importers · BusinessesArt. 1(15)(a), replacing Art. 25(2) of Regulation (EU) 2023/956 · from entry into forceRequirementCUST-04Apply the material and chemical compositions that the Commission fixes by implementing act for Annex I goods.Importers and authorised CBAM declarants of Annex I goods · BusinessesArt. 1(15)(d), adding Art. 25(7) to Regulation (EU) 2023/956 · from entry into forceRequirementGOV-01Base the 2027 assessment due by 30 April 2027 on import data for the goods in both the existing and the newly extended Annex I.European Commission · GovernmentsArt. 1(2), adding a subparagraph to Art. 2a(3) of Regulation (EU) 2023/956 · by 30 April 2027RequirementGOV-02Report to Parliament and Council before 1 January 2028 and biennially thereafter on CBAM's operation, covering carbon leakage, internal-market and price effects, governance, circumvention practices, penalties and per-country emission intensity.European Commission · GovernmentsArt. 1(20), replacing the second subparagraph of Art. 30(6) of Regulation (EU) 2023/956 · before 1 January 2028, then every two yearsRequirementGOV-03State the material composition of each downstream good in the verification report.Accredited verifiers preparing CBAM verification reports · BusinessesArt. 1(23)(b), inserting point (ka) in point 2 of Annex VI of Regulation (EU) 2023/956 · applies from 1 January 2028 per Art. 2RequirementGOV-04Set out in the verification report the quantities of each type of goods produced, the quantification of the installation's direct emissions, how those emissions are attributed across goods, and the energy and emissions flows not associated with those goods.Accredited verifiers preparing CBAM verification reports · BusinessesArt. 1(23)(a), deleting points (g) to (j) of point 2 of Annex VI of Regulation (EU) 2023/956 · applies from 1 January 2028 per Art. 2SimplificationCBAMB-SCP-07Declare embedded emissions and surrender certificates for goods added to the existing 'Iron and steel' table -- agglomerated iron ore, stranded wire and cables, unplated welded grill and netting, springs, enamelled and other household articles, and other cast articles of iron or steel.Importers and authorised CBAM declarants of the newly listed iron and steel goods · BusinessesArt. 1(21); Annex I, point (1) replacing the 'Iron and Steel' table in point 2 of Annex I of Regulation (EU) 2023/956 · applies from 1 January 2028 per Art. 2RequirementCBAMB-VER-02Use a verifier accredited by a Member State national accreditation body, there being no route to recognition of a third-country accreditation body.Authorised CBAM declarants and third-country operators procuring verification · GovernmentsArt. 1(1)(e), replacing Art. 2(12) of Regulation (EU) 2023/956 · from entry into forceSimplificationCBAMB-DECL-07Report, in the standard declaration format, the detail supporting each total -- per installation and per country of origin -- including the carbon price paid and the default carbon price for the purposes of Art. 9(4).Authorised CBAM declarants · BusinessesArt. 1(5)(b), replacing the first sentence of Art. 6(6) of Regulation (EU) 2023/956 · from entry into forceRequirementCBAMB-ANTI-05Designate, by implementing act, the goods or goods/origin combinations for which traceability evidence must accompany the declaration, and the type of evidence required.European Commission · GovernmentsArt. 1(5)(c), adding Art. 6(6a) to Regulation (EU) 2023/956 · from entry into forceRequirementCBAMB-CUST-05Communicate customs information at the scope, periodicity, timing and by the means the implementing acts prescribe, for the competent-authority flow under Art. 25(3) as well as the customs flow under Art. 25(2).Member State customs authorities and competent authorities · GovernmentsArt. 1(15)(c), replacing the first sentence of Art. 25(6) of Regulation (EU) 2023/956 · from entry into forceRequirement

11 measures

Power and heat

ELEC-01Accept default values for imported electricity that reflect fossil generation only, regardless of the exporting country's actual generation mix.Importers and authorised CBAM declarants of electricity · BusinessesArt. 1(22); Annex II, point (3) replacing point 4.2.1 of Annex IV of Regulation (EU) 2023/956 · from entry into forceSimplificationELEC-02Take the alternative default value from the CO2 emission factor, rather than from the emission factor for electricity, when demonstrating that the exporting area's electricity is cleaner than the applicable default.Importers and authorised CBAM declarants of electricity from lower-carbon third countries · BusinessesArt. 1(22); Annex II, point (4) replacing point 4.2.2 of Annex IV of Regulation (EU) 2023/956 · from entry into forceSimplificationELEC-03Accept the standard default value for indirect emissions where the exporting country's actual electricity mix is cleaner than that default.Importers of goods with indirect emissions from lower-carbon third countries · BusinessesArt. 1(22); Annex II, point (5) replacing the second paragraph of point 4.3 of Annex IV of Regulation (EU) 2023/956 · from entry into forceSimplificationELEC-04Hold a power purchase agreement directly with the third-country electricity producer, with no intermediary in the chain, in order to claim actual emissions.Importers and authorised CBAM declarants of electricity claiming actual emissions · BusinessesArt. 1(22); Annex II, point (6)(a) replacing point (a) of point 5 of Annex IV of Regulation (EU) 2023/956 · applies from 1 January 2026 per Art. 2SimplificationELEC-05Demonstrate that the generating installation is directly connected to the Union transmission system, or that no physical network congestion existed at the time of export, in order to claim actual emissions for imported electricity.Importers and authorised CBAM declarants of electricity claiming actual emissions · BusinessesArt. 1(22); Annex II, point (6)(b) deleting point (b) of point 5 of Annex IV of Regulation (EU) 2023/956 · applies from 1 January 2026 per Art. 2SimplificationELEC-06Firmly nominate the claimed electricity to allocated interconnection capacity across origin, destination and transit, matching production within the same hour, and forgo the claim where capacity is allocated implicitly.Importers and authorised CBAM declarants of electricity claiming actual emissions · BusinessesArt. 1(22); Annex II, point (6)(c) replacing point (d) of point 5 of Annex IV of Regulation (EU) 2023/956 · applies from 1 January 2026 per Art. 2RequirementELEC-07Conclude, and then honour, a Memorandum of Understanding setting the timeline for the Art. 2(7) exemption and for putting an EU ETS-equivalent carbon price on electricity generation.Third countries seeking electricity market coupling with the Union, and the Commission · GovernmentsArt. 1(1)(c), inserting Art. 2(7a) of Regulation (EU) 2023/956 · from entry into forceRequirementELEC-08Assess third-country listing for the electricity exemption against the Memorandum of Understanding timeline as well as the paragraph 7 conditions.European Commission · GovernmentsArt. 1(1)(d), replacing Art. 2(8) of Regulation (EU) 2023/956 · from entry into forceRequirementCBAMB-ELEC-09Use, as the emission factor for electricity, the weighted average CO2 intensity of all electricity produced in the geographic area, in place of a factor representing the emission intensity of the electricity consumed in producing the goods.Importers and authorised CBAM declarants of electricity and of goods carrying embedded indirect emissions · BusinessesArt. 1(22); Annex II, point (1) replacing point (e) of point 1 of Annex IV of Regulation (EU) 2023/956 · applies from 1 January 2026 per Art. 2RequirementCBAMB-ELEC-10Hold a power purchase agreement that involves the physical delivery of electricity, not merely a direct contractual purchase, in order to claim actual embedded emissions for imported electricity.Importers and authorised CBAM declarants of electricity claiming actual emissions · BusinessesArt. 1(22); Annex II, point (1) replacing point (f) of point 1 of Annex IV of Regulation (EU) 2023/956 · applies from 1 January 2026 per Art. 2RequirementCBAMB-SCP-08A third country or territory may be added to or removed from the Annex III exemption lists by delegated act, including as a consequence of CBAM incorporation into the EEA Agreement, and under urgency where imperative grounds require it.European Commission; importers of goods originating in third countries listed in Annex III · GovernmentsArt. 1(1)(e), replacing Art. 2(11) of Regulation (EU) 2023/956 · from entry into forceRequirement

8 measures

No sector named — applies by size or activity

DECL-04Identify in the authorisation application, by EORI or national identification number, every person on whose behalf the applicant acts.Applicants for authorised CBAM declarant status acting on behalf of others · BusinessesArt. 1(4), replacing point (h) of Art. 5(5) of Regulation (EU) 2023/956 · from entry into forceRequirementANTI-04Adopt the high-risk delegated acts within three months of finding sufficient evidence of a high risk of abusive practices.European Commission · GovernmentsArt. 1(5)(c), adding Art. 6(7) to Regulation (EU) 2023/956 · from entry into forceRequirementFIN-02Leave the guarantee in place until after 30 September of the second surrender year, and for longer where the competent authority justifies an extension.Authorised CBAM declarants that have provided an Art. 17(5a) guarantee · BusinessesArt. 1(9)(b), replacing Art. 17(7) of Regulation (EU) 2023/956 · from entry into forceRequirementFIN-05Repurchase the excess CBAM certificates through the common central platform on behalf of the Member State where the authorised CBAM declarant is established.European Commission · GovernmentsArt. 1(14), replacing the first sentence of the second subparagraph of Art. 23(1) of Regulation (EU) 2023/956 · from entry into forceSimplificationFIN-07Find a certifying person meeting the independence test without the benefit of an express route through national accreditation.Authorised CBAM declarants claiming a carbon price paid in a third country · BusinessesArt. 1(7)(a)(2), adding a subparagraph to Art. 9(2) of Regulation (EU) 2023/956 · from entry into forceSimplificationCUST-03Verify, on a competent authority's request, the correctness or accuracy of communicated customs information.Customs authorities and the Commission · GovernmentsArt. 1(15)(b), adding a subparagraph to Art. 25(3) of Regulation (EU) 2023/956 · from entry into forceRequirementVER-01Follow the verification procedures the Commission specifies by delegated act.Accredited verifiers of embedded emissions · BusinessesArt. 1(10), adding a sentence to Art. 18(3) of Regulation (EU) 2023/956 · from entry into forceRequirementGOV-05Publish the CBAM certificate price on the first working day of the following calendar week.European Commission · GovernmentsArt. 1(12)(b), replacing the first sentence of Art. 21(2) of Regulation (EU) 2023/956 · from entry into forceRequirement

Audit view

A measure naming several sectors is filed above under the first of them; the full list is on each measure page. To read the act from start to finish instead — every measure, article by article — open the audit view →