SectorsBatteries and solarSK On Iváncsa

SK On Iváncsa

SK On · Iváncsa · HU · Batteries and solar · supply security

In construction

SK On Iváncsa is SK On's batteries and solar project at Iváncsa, Hungary.

Why it matters

It is being built.

Where SK On Iváncsa is

SK On Iváncsa is at Iváncsa cell works. Also in frame: 6 sites using the same technology.

AustriaAustriaCzechiaCroatiaCroatiaHungaryHungaryRomaniaRomaniaSerbiaSerbiaSloveniaSloveniaSlovakiaSlovakiaUkraineUkraineSK On Iváncsa — SK On. Iváncsa cell works, 47.1340° N 18.8204° E.SK On IváncsaSK OnSK On IváncsaSK OnCATL Debrecen — Contemporary Amperex Technology. Debrecen Southern Industrial Park, 47.4632° N 21.6201° E.CATL DebrecenContemporary Amperex TechnologyCATL DebrecenContemporary AmperexTechnologyEVE Power Debrecen — EVE Power. Debrecen 0237/405, Északnyugati Gazdasági Övezet, 47.5806° N 21.5154° E.EVE Power DebrecenEVE PowerEVE Power DebrecenEVE PowerGotion InoBat Batteries Šurany — Gotion InoBat Batteries. Šurany gigafactory, 48.0686° N 18.1629° E.Gotion InoBat Batteries ŠuranyGotion InoBat BatteriesGotion InoBatBatteries ŠuranyGotion InoBat BatteriesSamsung SDI Göd — Samsung SDI. Göd cell works, 47.6740° N 19.1631° E.Samsung SDI GödSamsung SDISamsung SDI GödSamsung SDISK On Komárom — SK On. Komárom industrial park works, 47.7401° N 18.0685° E.SK On KomáromSK OnSK On KomáromSK OnSunwoda Nyíregyháza — Sunwoda. Nyíregyháza cell works, 47.8953° N 21.7435° E.Sunwoda NyíregyházaSunwodaSunwodaNyíregyházaSunwoda
filled: operating, commissioning or under constructionhollow: announced, funded, or pausedringed: this project

47.1340° N 18.8204° EIváncsa cell works

as of 2026-09-05

Status

  1. Announced2021-01-29
  2. Funded
  3. FID taken
  4. In construction2022-03-23
  5. Operating
  • 2021-01-29AnnouncedThe Hungarian government announces the investment: 'Magyarország történetének legnagyobb zöldmezős beruházását valósítja meg az SK Innovation a Fejér megyei Iváncsán, a dél-koreai vállalat 681 milliárd forintos fejlesztéssel új akkumulátorgyárat épít, ezzel 2500 embernek ad majd közvetlenül munkát' — 681 billion forints, 2 500 direct jobs, and construction to start in the third quarter of that year.source
  • 2022-03-23In constructionelectrive reports that the project started in early 2021 and gives an annual capacity of 30 GWh with the final expansion in 2028. THE STATUS STOPS HERE. Trade reporting describes mass production from 2024 at 30 GWh; SK On's own newsroom is served under a certificate for a different host and no source this pipeline can read states a production start, so the row does not claim one and joins the status-age report.source

Technology and measures

  • Gigafactory-scale cell manufacturingcommercialElectrode coating, cell assembly and formation run at gigawatt-hour scale on one site. It is the process node rather than a chemistry: the same lines make several chemistries, and what decides whether Europe has cells is whether the lines exist and yield, not which cathode runs through them.

Funding

No public capital recorded for this project.

Sources