SectorsBatteries and solarPowerCo Valencia

PowerCo Valencia

PowerCo · Sagunto · ES · Batteries and solar · supply security

In construction40 GWh per year

PowerCo Valencia is PowerCo's batteries and solar project at Sagunto, Spain.

Why it matters

It is being built.

  • PowerCo Valencia went into construction on 17 March 2023. as of 2023-03-17
  • It is at Sagunto, Spain. as of 2023-03-17
  • It uses gigafactory-scale cell manufacturing. as of 2023-03-17
  • It is built for 40 GWh per year. as of 2023-03-17
  • No committed public money is on file for it. as of 2023-03-17

Where PowerCo Valencia is

PowerCo Valencia is at Sagunto gigafactory. Nothing else drawn falls inside this frame.

SpainSpainPowerCo Valencia — PowerCo. Sagunto gigafactory, 39.6482° N 0.2683° W.PowerCo ValenciaPowerCoPowerCo ValenciaPowerCo
filled: operating, commissioning or under constructionhollow: announced, funded, or pausedringed: this project

39.6482° N 0.2683° WSagunto gigafactory

as of 2023-03-17

Status

  1. Announced
  2. Funded
  3. FID taken
  4. In construction2023-03-17
  5. Operating
  • 2023-03-17In constructionPowerCo 'gave the starting signal for construction of its second PowerCo cell factory' on about 130 hectares at Sagunto, at an initial 40 GWh per year with room to expand. Trade press reports series production moving to July 2027; no company statement of the revised date has been read.source

Technology and measures

  • Gigafactory-scale cell manufacturingcommercialElectrode coating, cell assembly and formation run at gigawatt-hour scale on one site. It is the process node rather than a chemistry: the same lines make several chemistries, and what decides whether Europe has cells is whether the lines exist and yield, not which cathode runs through them.