AESC Navalmoral de la Mata
AESC · Navalmoral de la Mata · ES · Batteries and solar · supply security
In construction94.24 GWh per year
AESC Navalmoral de la Mata is AESC's batteries and solar project at Navalmoral de la Mata, Spain.
Why it matters
It is being built.
- AESC Navalmoral de la Mata went into construction on 8 July 2024. as of 2024-07-08
- It is at Navalmoral de la Mata, Spain. as of 2026-06-08
- It uses gigafactory-scale cell manufacturing and lithium iron phosphate cells. as of 2026-06-08
- It is built for 94.24 GWh per year. as of 2026-06-08
- No committed public money is on file for it. as of 2026-06-08
Where AESC Navalmoral de la Mata is
AESC Navalmoral de la Mata is at Parcela I-67, Polígono Industrial Expacionavalmoral. Also in frame: 1 site using the same technology.
filled: operating, commissioning or under constructionhollow: announced, funded, or pausedringed: this project
39.9152° N 5.5116° WParcela I-67, Polígono Industrial Expacionavalmoral
as of 2026-09-05
Status
- Announced
- Funded
- FID taken
- In construction2024-07-08
- 2024-07-08In constructionAESC's own first-stone release: 'Today, Monday, July 8, marked the groundbreaking ceremony of AESC's future gigafactory for batteries in Navalmoral de la Mata, Cáceres.' La Moncloa and the Junta de Extremadura record the same ceremony, with the Prime Minister and the President of the Junta present. TWO TIMETABLES THAT DO NOT AGREE, AND BOTH ARE HELD. The 2024 release says the plant 'is scheduled to begin production in 2026'; the Junta told the Extremadura Assembly in June 2026 that construction concludes in November 2027 and the first cells come in December 2028, and an opposition deputy in the same session said that two years after the first stone there is 'la primera piedra y nada más'. The status is what none of them disputes — ground was broken and no cell has been made — and the four-and-a-half-year gap between the ceremony and the first cell is the fact a reader should have, not a discrepancy to be resolved by taking the newest number silently.source
Technology and measures
- Gigafactory-scale cell manufacturingcommercialElectrode coating, cell assembly and formation run at gigawatt-hour scale on one site. It is the process node rather than a chemistry: the same lines make several chemistries, and what decides whether Europe has cells is whether the lines exist and yield, not which cathode runs through them.
- Lithium iron phosphate cellscommercialA cathode of iron and phosphate rather than nickel, manganese and cobalt. Lower energy density and lower cost, and it removes the two metals whose supply is most concentrated outside Europe, which is why it is the chemistry the volume end of the market has moved to.
Funding
No public capital recorded for this project.
Sources
- AESC Spain celebrates the laying of the first stone of the battery gigafactory in Navalmoral de la Mata (Cáceres)AESC · 2024-07-08
- Sánchez asiste a la colocación de la primera piedra de la gigafactoría de bateríasLa Moncloa (Government of Spain) · 2024-07-08
- María Guardiola asiste a la puesta de la primera piedra de la gigafactoríaJunta de Extremadura · 2024-07-08
- Resolución de 17 de mayo de 2023, autorización ambiental integrada — planta de fabricación de baterías de iones de litio, Envision AESC Spain, SLDiario Oficial de Extremadura · 2023-05-23
- La Junta de Extremadura somete a información pública la autorización ambiental para el proyecto de la gigafactoría en NavalmoralJunta de Extremadura · 2022-11-02
- La Gigafactoría de baterías de Navalmoral de la Mata proyecta el inicio de la producción de celdas para diciembre de 2028La Portada de Extremadura, relaying the Junta de Extremadura · 2026-06-08