Electricity market design — non-fossil flexibility

Regulation (EU) 2019/943, Arts. 19e–19h, consolidated 16.07.2024

Direction
6 burden · 1 benefit
Status
7 adopted
Channel
7 direct · 0 reached

The platform holds 7 measures for Electricity market design: 6 imposing a burden, 1 conferring a benefit. Of these, 7 from law in force; 7 arrive directly, 0 through a channel.

Reach

Names 1 sector, reaches 2

Electricity market design names 1 sector; 1 more is — batteries and solar — reached without being named, by another act.

Batteries and solar — reached by 5 measures, via another act

Connections

This file in the graph

Every line is an edge in the platform's knowledge graph — acts this file amends or its measures cite, and the sectors those measures apply to. Counts are computed at build time and checked against the graph.

PowerPowernamed by 7 measuresBatteries and solarBatteries and solarreached by 5 measuresElectricity market design7 measures
Sectors (2)

7 measures

Power and heat

FLEX-01Adopt, every two years, a report on the estimated national flexibility needs for at least the next 5 to 10 years.The regulatory authority, or another authority or entity designated by the Member State · GovernmentsArt. 19e(1) · One year after ACER approves the methodology, and every two y…RequirementFLEX-02Consider, in that report, the potential of non-fossil flexibility resources — demand response and energy storage — to meet the flexibility needs, at both transmission and distribution level.The regulatory authority, or another authority or entity designated by the Member State · GovernmentsArt. 19e(2)(b) · One year after ACER approves the methodology, and every two y…RequirementFLEX-03Provide the data and analyses needed for the flexibility-needs report, in the type and format defined by ENTSO-E and the EU DSO entity.Transmission system operators and distribution system operators · BusinessesArt. 19e(3) · In forceRequirementOBJ-01Define an indicative national objective for non-fossil flexibility, stating the specific contributions of demand response and of energy storage to it, and reflect it in the integrated national energy and climate plan and progress reports.Member States · GovernmentsArt. 19f · Six months after the first report under Art. 19eRequirementSUP-01A Member State may pay for the available capacity of non-fossil flexibility through a support scheme, where investment falls short of its indicative national objective.Member States · GovernmentsArt. 19g(1) · In forceEntitlementSUP-02Consider adapting the design of an existing capacity mechanism to promote the participation of non-fossil flexibility, including demand side response and energy storage.Member States operating a capacity mechanism · GovernmentsArt. 19g(1), second sentence · In forceRequirementDES-01Where such a scheme is applied, keep it within what is necessary to meet the objective cost-effectively and limit it to NEW investment in non-fossil flexibility resources such as demand side response and energy storage.Member States applying a non-fossil flexibility support scheme · GovernmentsArt. 19h(a) and (b) · In forceRequirement

Audit view

A measure naming several sectors is filed above under the first of them; the full list is on each measure page. To read the act from start to finish instead — every measure, article by article — open the audit view →