NOVO Energy Gothenburg

NOVO Energy · Gothenburg · SE · Batteries and solar · supply security

Paused

NOVO Energy Gothenburg is NOVO Energy's batteries and solar project at Gothenburg, Sweden.

Why it matters

Work has stopped, and the reason is in its history below.

Where NOVO Energy Gothenburg is

NOVO Energy Gothenburg is paused, and this register holds no position for it. It was to be at Gothenburg, Sweden; the works was never placed to the precision a mark on a picture would claim, and looking for one was not thought worth doing on a project that stopped.

LOCATION NOT SOUGHT: PROJECT PAUSED. The perimeter asks for a site the company has confirmed and a citable source can place, and the second half is research that only pays for itself on a works somebody might visit. NOVO Energy has laid off every employee and cannot say when production might start or in what organisational structure; the works in the Gothenburg area is confirmed by the company and is not being placed while the project is stopped. The absence is recorded as a decision rather than left as a gap: this register looks for a position on projects that are being built, and says so where it has not looked.

Status

  1. Announced
  2. Funded
  3. FID taken
  4. In construction
  5. Operating
  6. Paused2026-01-13
  • 2026-01-13PausedNOVO Energy's own statement: 'until a new technology partner is secured, NOVO Energy can no longer proceed with its operations as previously planned', with layoffs affecting all positions in the company — 75 in all, notified to the unions and to Arbetsförmedlingen. Volvo Cars, the owner, 'maintains its long-term ambition to produce batteries for its electric cars in the Gothenburg, Sweden area' and cannot say when production might start or in what structure. THE HISTORY STARTS HERE because it is the first event on this site sourced to the company: the venture was formed with Northvolt in 2021 and the site was reported under construction from 2023, and neither is read into this register. Volvo Cars took full ownership on 29 January 2025, on Northvolt's own release, which is on file below as the record of how the ownership got here.source

Technology and measures

  • Gigafactory-scale cell manufacturingcommercialElectrode coating, cell assembly and formation run at gigawatt-hour scale on one site. It is the process node rather than a chemistry: the same lines make several chemistries, and what decides whether Europe has cells is whether the lines exist and yield, not which cathode runs through them.

Funding

  • €202 mEU Innovation Fundsignedets:FND-03Awarded under the Innovation Fund as it stands today (Art. 10a(8) of Directive 2003/87/EC). The register carries the Fund through the ETS revision's Art. 10cb, which re-establishes it, so ets:FND-03 is the register's handle on the programme rather than the provision this award was made under.“AMOUNT OF INNOVATION FUND GRANT EUR 201,500,000”sourcesource