Pipe58, Progressive Energy · Baltic Sea · SE · Carbon capture and fuels · decarbonisation
Highway58 is Pipe58, Progressive Energy's carbon capture and storage project at Baltic Sea, Sweden.
Why it matters
Nothing has been committed to it yet.
- Highway58 was announced on 27 January 2026. as of 2026-01-27
- Its site is at Baltic Sea, Sweden. as of 2026-01-27
- It uses CO2 transport and storage. as of 2026-01-27
- No committed public money is on file for it. as of 2026-01-27
Where Highway58 is
Highway58 is at Baltic Sea, Sweden, and this register holds no position for it. The company has confirmed the site and no citable source places the works: it is being built where nobody has yet drawn it. The row is held anyway — position is not a condition of being on file — and what was searched, and what was found instead, is below.
NO POSITION SOUGHT BY THIS PASS. Brief 8 forbids geocoding in a census — a municipality is not a point — and the source that admits this row names Baltic Sea and not a position. Transport and storage is the sector where that bites hardest: a pipeline is a route rather than a place, and a store is a reservoir whose position its operator rarely publishes. The row is admitted without one, on the rule that position is not an admission leg.
Status
- Announced2026-01-27
- Funded
- FID taken
- In construction
- 2026-01-27AnnouncedPipe58 with Progressive Energy, the project's own site: “20 MtCO2 annual capacity for phase 1. >1000 km length of phase 1 backbone. Early 2030s phase 1 aimed to be operational.”source
Technology and measures
- CO2 transport and storageearly-commercialThe pipelines, ships, terminals and permitted geological stores that a captured tonne has to reach before it counts as abated, and which no single site that captures can build for itself.
Funding
No public capital recorded for this project.