SectorsBatteries and solarBritishvolt Blyth

Britishvolt Blyth

Britishvolt · Cambois, Blyth · GB · Batteries and solar · supply security

Cancelled35 GWh per year

Britishvolt Blyth is Britishvolt's batteries and solar project at Cambois, Blyth, United Kingdom.

Why it matters

It will not be built.

  • Britishvolt Blyth was cancelled on 17 January 2023. as of 2023-01-17
  • It was to be at Cambois, Blyth, United Kingdom. as of 2026-09-06
  • It uses gigafactory-scale cell manufacturing. as of 2026-09-06
  • It was to be built for 35 GWh per year. as of 2026-09-06
  • No committed public money is on file for it. as of 2026-09-06

Where Britishvolt Blyth is

Britishvolt Blyth is cancelled, and this register holds no position for it. It was to be at Cambois, Blyth, United Kingdom; the works was never placed to the precision a mark on a picture would claim, and looking for one was not thought worth doing on a project that stopped.

LOCATION NOT SOUGHT: PROJECT CANCELLED. The perimeter asks for a site the company has confirmed and a citable source can place, and the second half is research that only pays for itself on a works somebody might visit. The company went into administration in January 2023 and is now in liquidation; nothing was built on the Cambois site and what stands there now is somebody else's project. THE POSITION IS KNOWN TO BE FINDABLE AND IS NOT BEING FOUND: Northumberland's permit 21/00818/FULES names the parcel — 'Land At Former Power Station Site On Northern Side Of Cambois', 92.2 hectares — and the committee report that carries it refuses this pipeline. A person could open it in a minute. The absence is recorded as a decision rather than left as a gap: this register looks for a position on projects that are being built, and says so where it has not looked.

Status

  1. Announced2020-12-10
  2. Funded
  3. FID taken
  4. In construction
  5. Operating
  6. Cancelled2023-01-17
  • 2020-12-10AnnouncedBritishvolt's own announcement: the north-east site at Cambois, near Blyth, for what it called Britain's first battery gigafactory. Capacity 35 GWh at completion.source
  • 2023-01-17CancelledADMINISTRATORS APPOINTED, from the official record rather than from reporting. The London Gazette's notice 4260297 of 19 January 2023, category Corporate Insolvency, type Appointment of Administrators: POWER BY BRITISHVOLT LIMITED (company number 12381543), 'Date of Appointment: 17 January 2023', administrators Joanne Honor Robinson and Alan Michael Hudson of Ernst & Young LLP and Daniel Christopher Hurd. Companies House carries the same case — administration started 17 January 2023, ended 28 October 2024 — and the company's status is now Liquidation, a creditors' voluntary liquidation whose winding up commenced on 28 October 2024. The status date is the appointment and not the publication: the company stopped on the 17th and the Gazette said so on the 19th.source

Technology and measures

  • Gigafactory-scale cell manufacturingcommercialElectrode coating, cell assembly and formation run at gigawatt-hour scale on one site. It is the process node rather than a chemistry: the same lines make several chemistries, and what decides whether Europe has cells is whether the lines exist and yield, not which cathode runs through them.