Captured CO2

waste stream

What a capture plant produces and cannot sell. It is abated only once it is stored, so every tonne recorded here is a tonne owed to a transport and storage chain built by other parties on other timetables.

Read in Cement and concrete, Steel.

Produced by

  • Brevik CCSsince 2025-06-18400000 tonnes CO2 per year Heidelberg Materials“Brevik CCS will capture around 400,000 tonnes of CO₂ per year, representing 50% of the plant's emissions.” — data/transition/parameters.json
  • GeZerosince 2023-12-15700000 tonnes CO2 per year Heidelberg Materials“capturing 700,000 tonnes of CO₂ annually from 2029.” — data/transition/parameters.json
  • ANRAVsince 2023-01-20800000 tonnes CO2 per year Heidelberg Materials“will have a capture capacity of about 800,000 t CO₂ per year” — data/transition/parameters.json
  • Carbon2Businesssince 2024-04-221.2 Mt CO2 per year Holcim“capture more than 1.2 million tons of CO2 emissions annually” — data/transition/parameters.json
  • IFESTOSsince 2023-07-141.9 Mt CO2 per year World Cement“an absolute annual GHG emissions avoidance of more than 1.9 million tons of CO2” — data/transition/parameters.json
  • 3D — DMX demonstration in Dunkirksince 2024-03-14The release states the capture rate on the treated stream and no tonnage for the pilot unit, so this edge carries no sourced volume.“capture the CO2 present in blast furnace gases emitted during steel production at ArcelorMittal's Dunkirk site” — data/transition/parameters.json · The first non-cement producer of this material. One node with an edge on each side is what the material kind exists for, and it is also why the CO2 transport and storage constraint is now a constraint on two sectors rather than one.

Consumed by

  • CO2 transport and storagesince 2024-06-13“Member States shall take the necessary measures to enable access to CO2 transport networks and to storage sites for the purposes of geological storage of the produced and captured CO2 as far as it is economically feasible to do so or when a potential customer is willing to pay, in accordance with Article 21 of Directive 2009/31/EC.” — data/nzia.json